United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Massachusetts (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown191,792 MW
Active in queue834 MW2 requests
Agreement signed6.8 MW1 requests
Withdrawn191,792 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

19 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind
Offshore wind
860 MWWithdrawn / abandoned MAISO-NE Dec 2018target 2025
Offshore Wind
Offshore wind
400 MWWithdrawn / abandoned MAISO-NE Dec 2018target 2025
Storage
Battery storage
150 MWWithdrawn / abandoned Middlesex, MAISO-NE Apr 2018target 2021
Battery Storage
Battery storage
143 MWWithdrawn / abandoned Barnstable, MAISO-NE Mar 2018target 2021
Energy Storage
Battery storage
103 MWWithdrawn / abandoned Bristol, MAISO-NE Apr 2018target 2022
Palmer Substation - NG Western MA Area Cluster Study
Solar
18.1 MWWithdrawn / abandoned Hampden, MAISO-NE Dec 2018target 2022
Lashaway Substation - NG Western MA Area Cluster Study
Solar
13.7 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Meadow Street 552 Substation - NG Western MA Area Cluster Study
Solar
13.4 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Ware Substation - NG Western MA Area Cluster Study
Solar
13.3 MWWithdrawn / abandoned Hampshire, MAISO-NE Dec 2018target 2023
Thorndike Substation - NG Western MA Area Cluster Study
Solar
12.4 MWWithdrawn / abandoned Hampden, MAISO-NE Dec 2018target 2023
Barre substation - NG Western MA Area Cluster Study
Solar
12.4 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Webster St - NG Western MA Area Cluster Study
Solar
9.0 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2020
Solar
Solar
8.1 MWWithdrawn / abandoned Worcester, MAISO-NE Nov 2018target 2020
E. Westminster Substation - NG Western MA Area Cluster Study
Solar
8.0 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Combined Reciprocating, Solar and Battery modification
Solar + storage
7.8 MWWithdrawn / abandoned Middlesex, MAISO-NE Sep 2018target 2022
Wind
Onshore wind
7.5 MWWithdrawn / abandoned Berkshire, MAISO-NE Jun 2018target 2020
Little Rest Rd Substation - NG Western MA Area Cluster Study
Solar
6.0 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
E. Winchendon Substation - NG Western MA Area Cluster Study
Solar
3.9 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Royalston - NG Western MA Area Cluster Study
Solar
2.5 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)