United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
OFFSHORE WIND Β· ISO-NEOffshore Wind
Offshore Wind is a 400 MW offshore wind request withdrawn in the ISO-NE interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2018 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 829
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NSTAR Electric Company 345 kV lines 322 and 342
- Location
- Massachusetts
- Technology
- Offshore Wind: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 December 2018
- Proposed online date
- July 2025
- Withdrawn
- May 2022
Location
No county location in the queue data.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem