Withdrawn queue requests in Massachusetts (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown112,118 MW
Active in queue791 MW1 requests
Agreement signed791 MW1 requests
Withdrawn112,118 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind w/ battery storage
Other
880 MWWithdrawn / abandoned MAISO-NE Apr 2017target 2024
Offshore Wind
Offshore wind
400 MWWithdrawn / abandoned MAISO-NE Dec 2017target 2023
Offshore Wind
Offshore wind
288 MWWithdrawn / abandoned MAISO-NE Jul 2017target 2023
Energy Storage
Battery storage
150 MWWithdrawn / abandoned Barnstable, MAISO-NE Nov 2017target 2021
Energy Storage
Battery storage
100 MWWithdrawn / abandoned Middlesex, MAISO-NE Nov 2017target 2023
Energy Storage
Battery storage
100 MWWithdrawn / abandoned Bristol, MAISO-NE Nov 2017target 2021
Offshore Wind with battery addition
Other
75.0 MWWithdrawn / abandoned MAISO-NE Dec 2017target 2023
Energy Storage
Battery storage
50.0 MWWithdrawn / abandoned Worcester, MAISO-NE Nov 2017target 2021
Repowering Increase
Gas
34.8 MWWithdrawn / abandoned Norfolk, MAISO-NE Apr 2017target 2021
solar with battery
Solar + storage
20.0 MWWithdrawn / abandoned Worcester, MAISO-NE Sep 2017target 2020
Solar
Solar
20.0 MWWithdrawn / abandoned Berkshire, MAISO-NE Oct 2017target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)