United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Maryland

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown141,462 MW
Active in queue5,942 MW57 requests
Agreement signed1,462 MW14 requests
Withdrawn40746.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Fourth Quarter
Battery storage Β· Fourth Quarter BESS, LLC
500 MWAgreement signed Montgomery, MDPJM Oct 2020target 2030
Jade Meadow III Solar Facility
Solar + storage
300 MWAgreement signed Garrett, MDPJM Sep 2020target 2028
Cherrywood Solar I
Solar
202 MWAgreement signed Caroline, MDPJM Feb 2016target 2026
CPV Backbone Solar
Solar
175 MWAgreement signed Garrett, MDPJM Mar 2020target 2025
Onshore wind project AE2-289, Allegany County
Onshore wind
80.0 MWAgreement signed Allegany, MDPJM Mar 2019target 2021
Morgnec Road Solar
Solar
55.8 MWAgreement signed Kent, MDPJM Apr 2016target 2025
Egypt Road Solar
Solar
51.1 MWAgreement signed Dorchester, MDPJM Apr 2016target 2025
Porter Mill Solar
Solar
45.8 MWAgreement signed Wicomico, MDPJM Jan 2017target 2026
Frosty Valley Energy Center
Solar
20.0 MWAgreement signed Anne Arundel, MDPJM Mar 2020target 2027
East Hagerstown Solar
Solar
11.8 MWAgreement signed Washington, MDPJM Mar 2017target 2026
SBC Solar
Solar + storage
10.0 MWAgreement signed Dorchester, MDPJM Mar 2020target 2027
Cedar Lane Solar
Solar
4.0 MWAgreement signed Queen Anne's, MDPJM Oct 2015target 2026
RHC Solar
Solar + storage
3.9 MWAgreement signed Somerset, MDPJM Apr 2020target 2024
GGC Solar
Solar + storage
2.7 MWAgreement signed Dorchester, MDPJM Mar 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)