Cherrywood Solar I is a 202 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Caroline County, Maryland, connecting to DPL.
Queue statusConsented
- PlanningQueued Feb 2016 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AB2-037
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Keeney-Steele 230kV
- Location
- Caroline County, Maryland
- Technology
- Solar: 202 MW
- Total requested
- 202 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 26 February 2016
- Proposed online date
- September 2026
Location
Marker shows the centre of Caroline County; the queue data does not give exact sites.
Other requests in Caroline County
- Waypost Solar ProjectSolar · 92.0 MW · suspended
- Gas project AD2-004, Caroline CountyGas · 600 MW · withdrawn
- Solar project AA2-152, Caroline CountySolar · 80.0 MW · withdrawn
- Solar + storage project AG2-419, Caroline CountySolar + storage · 40.0 MW · withdrawn
- Battery storage project AG2-381, Caroline CountyBattery storage · 20.0 MW · withdrawn
- Solar project AB2-142, Caroline CountySolar · 13.4 MW · withdrawn
- Solar project AA2-021, Caroline CountySolar · 7.0 MW · withdrawn
- Solar project AA1-127, Caroline CountySolar · 6.0 MW · withdrawn
- Solar project AA2-037, Caroline CountySolar · 5.0 MW · withdrawn
- Solar project AA1-021, Caroline CountySolar · 1.5 MW · withdrawn
- Solar project AA1-023, Caroline CountySolar · 1.5 MW · withdrawn
- Solar project AA1-020, Caroline CountySolar · 1.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem