United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR + STORAGE Β· PJMSolar + storage project AG2-419, Caroline County
Solar + storage project AG2-419, Caroline County is a 40.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Caroline County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-419
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- 3 Bridges Rd 34.5 kV
- Location
- Caroline County, Maryland
- Technology
- Solar: 40.0 MW Β· Battery
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 March 2021
- Proposed online date
- May 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Caroline County; the queue data does not give exact sites.
Other requests in Caroline County
- Cherrywood Solar ISolar Β· 202 MW Β· agreement signed
- Waypost Solar ProjectSolar Β· 92.0 MW Β· suspended
- Gas project AD2-004, Caroline CountyGas Β· 600 MW Β· withdrawn
- Solar project AA2-152, Caroline CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project AG2-381, Caroline CountyBattery storage Β· 20.0 MW Β· withdrawn
- Solar project AB2-142, Caroline CountySolar Β· 13.4 MW Β· withdrawn
- Solar project AA2-021, Caroline CountySolar Β· 7.0 MW Β· withdrawn
- Solar project AA1-127, Caroline CountySolar Β· 6.0 MW Β· withdrawn
- Solar project AA2-037, Caroline CountySolar Β· 5.0 MW Β· withdrawn
- Solar project AA1-021, Caroline CountySolar Β· 1.5 MW Β· withdrawn
- Solar project AA1-023, Caroline CountySolar Β· 1.5 MW Β· withdrawn
- Solar project AA1-020, Caroline CountySolar Β· 1.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem