SOLAR Β· PJMWaypost Solar Project
Waypost Solar Project is a 92.0 MW solar request suspended in the PJM interconnection queue, in Caroline County, Maryland, connecting to DPL.
Queue statusPaused / redesign
- PlanningQueued Feb 2016 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AB2-036
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Church - Oil City 138kV
- Location
- Caroline County, Maryland
- Technology
- Solar: 92.0 MW
- Total requested
- 92.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 26 February 2016
- Proposed online date
- December 2026
Location
Marker shows the centre of Caroline County; the queue data does not give exact sites.
Other requests in Caroline County
- Cherrywood Solar ISolar Β· 202 MW Β· agreement signed
- Gas project AD2-004, Caroline CountyGas Β· 600 MW Β· withdrawn
- Solar project AA2-152, Caroline CountySolar Β· 80.0 MW Β· withdrawn
- Solar + storage project AG2-419, Caroline CountySolar + storage Β· 40.0 MW Β· withdrawn
- Battery storage project AG2-381, Caroline CountyBattery storage Β· 20.0 MW Β· withdrawn
- Solar project AB2-142, Caroline CountySolar Β· 13.4 MW Β· withdrawn
- Solar project AA2-021, Caroline CountySolar Β· 7.0 MW Β· withdrawn
- Solar project AA1-127, Caroline CountySolar Β· 6.0 MW Β· withdrawn
- Solar project AA2-037, Caroline CountySolar Β· 5.0 MW Β· withdrawn
- Solar project AA1-021, Caroline CountySolar Β· 1.5 MW Β· withdrawn
- Solar project AA1-023, Caroline CountySolar Β· 1.5 MW Β· withdrawn
- Solar project AA1-020, Caroline CountySolar Β· 1.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem