Solar interconnection queue in Maine

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown14852 MW
Active in queue852 MW14 requests
Agreement signed672 MW13 requests
Withdrawn883,764 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
180 MWIn study York, MEISO-NE Jul 2023target 2029
Green Apple Solar
Solar
179 MWAgreement signed Androscoggin, MEISO-NE Feb 2021target 2027
Solar
Solar
165 MWAgreement signed Somerset, MEISO-NE Feb 2021target 2029
Three Rivers Solar
Solar
100 MWAgreement signed Hancock, MEISO-NE Jan 2019target 2026
Warren Meadow Solar
Solar
74.5 MWAgreement signed Knox, MEISO-NE Nov 2020target 2026
Solar Knox
Solar
33.5 MWAgreement signed Knox, MEISO-NE Oct 2021target 2027
BD Solar Church Hill
Solar
20.0 MWAgreement signed Androscoggin, MEISO-NE Feb 2020target 2028
GDC Saco Solar
Solar
20.0 MWAgreement signed York, MEISO-NE Oct 2019target 2027
Turner Meadow Solar
Solar
19.8 MWAgreement signed Androscoggin, MEISO-NE Jun 2021target 2026
SolarFairfield
Solar
18.1 MWAgreement signed Somerset, MEISO-NE Dec 2020target 2027
West Baldwin Solar
Solar
17.1 MWAgreement signed Cumberland, MEISO-NE Oct 2019target 2029
Emery Meadow Solar
Solar
16.4 MWAgreement signed York, MEISO-NE Apr 2020target 2027
Solar
Solar
7.0 MWAgreement signed Kennebec, MEISO-NE Aug 2019target 2022
Roxbury Solar
Solar
2.0 MWAgreement signed Oxford, MEISO-NE Oct 2021target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)