United States βΊ Grid βΊ Interconnection queues βΊ Kansas
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Kansas (2022 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project GEN-2022-013, Bourbon County Solar |
300 MW | In study |
| Solar project GEN-2022-015, Decatur County Solar |
270 MW | In study |
| Battery storage project GEN-2022-024, Bourbon County Battery storage |
200 MW | In study |
| Solar project GEN-2022-006, Labette County Solar |
200 MW | In study |
| Solar project GEN-2022-054, Bourbon County Solar |
200 MW | In study |
| Solar project GEN-2022-075, Ellis County Solar |
175 MW | In study |
| Solar project GEN-2022-065, Edwards County Solar |
145 MW | In study |
| Solar project GEN-2022-007, Lyon County Solar |
135 MW | In study |
| Solar project GEN-2022-004, Sedgwick County Solar |
33.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)