United States › Grid › Interconnection queues › Kansas
SOLAR · SPPSolar project GEN-2022-075, Ellis County
Solar project GEN-2022-075, Ellis County is a 175 MW solar request in interconnection study in the SPP interconnection queue, in Ellis County, Kansas, connecting to ITCGP.
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2022-075
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- ITCGP
- Connection point (POI)
- Tap on the Spearville - Post Rock 345kV line
- Location
- Ellis County, Kansas
- Technology
- Solar: 175 MW
- Total requested
- 175 MW
- Service type
- NRIS and ERIS
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 2 September 2022
- Proposed online date
- November 2027
Location
Marker shows the centre of Ellis County; the queue data does not give exact sites.
Other requests in Ellis County
- Battery storage project GEN-2016-160, Ellis CountyBattery storage · 20.0 MW · agreement signed
- Solar project GEN-2021-076, Ellis CountySolar · 113 MW · in study
- Onshore wind project GEN-2008-092, Ellis CountyOnshore wind · 201 MW · built
- Gas project GEN-2006-031, Ellis CountyGas · 75.6 MW · built
- Gas project GEN-2013-033, Ellis CountyGas · 28.0 MW · built
- Onshore wind project GEN-2006-032, Ellis CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GEN-2008-001, Ellis CountyOnshore wind · 200 MW · withdrawn
- Other project GEN-2023-SR14, Ellis CountyOther · 165 MW · withdrawn
- Onshore wind project GEN-2008-089, Ellis CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project GEN-2005-020, Ellis CountyOnshore wind · 50.0 MW · withdrawn
- Solar project GEN-2015-072, Ellis CountySolar · 20.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem