United States βΊ Grid βΊ Interconnection queues βΊ Kansas
OTHER Β· SPPOther project GEN-2023-SR14, Ellis County
Other project GEN-2023-SR14, Ellis County is a 165 MW other request withdrawn in the SPP interconnection queue, in Ellis County, Kansas, connecting to MIDW.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingJun 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-SR14
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- MIDW
- Connection point (POI)
- South Hays 230kV Substation
- Location
- Ellis County, Kansas
- Technology
- Other: 165 MW
- Total requested
- 165 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 February 2023
- Proposed online date
- June 2025
- Came online
- June 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of Ellis County; the queue data does not give exact sites.
Other requests in Ellis County
- Battery storage project GEN-2016-160, Ellis CountyBattery storage Β· 20.0 MW Β· agreement signed
- Solar project GEN-2022-075, Ellis CountySolar Β· 175 MW Β· in study
- Solar project GEN-2021-076, Ellis CountySolar Β· 113 MW Β· in study
- Onshore wind project GEN-2008-092, Ellis CountyOnshore wind Β· 201 MW Β· built
- Gas project GEN-2006-031, Ellis CountyGas Β· 75.6 MW Β· built
- Gas project GEN-2013-033, Ellis CountyGas Β· 28.0 MW Β· built
- Onshore wind project GEN-2006-032, Ellis CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2008-001, Ellis CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2008-089, Ellis CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2005-020, Ellis CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Solar project GEN-2015-072, Ellis CountySolar Β· 20.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem