BATTERY STORAGE · SPPBattery storage project GEN-2022-024, Bourbon County
Battery storage project GEN-2022-024, Bourbon County is a 200 MW battery storage request in interconnection study in the SPP interconnection queue, in Bourbon County, Kansas, connecting to WERE.
Queue statusIn planning
- PlanningQueued Jun 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2022-024
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Tap of Neosho - LaCygne 345 kV Line
- Location
- Bourbon County, Kansas
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 10 June 2022
- Proposed online date
- December 2028
Location
Marker shows the centre of Bourbon County; the queue data does not give exact sites.
Other requests in Bourbon County
- Solar project GEN-2022-013, Bourbon CountySolar · 300 MW · in study
- Battery storage project GEN-2020-090, Bourbon CountyBattery storage · 204 MW · in study
- Solar project GEN-2022-054, Bourbon CountySolar · 200 MW · in study
- Solar project GEN-2024-076, Bourbon CountySolar · 130 MW · in study
- Onshore wind project GEN-2017-005, Bourbon CountyOnshore wind · 190 MW · built
- Solar project GEN-2022-062, Bourbon CountySolar · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem