OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in California (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Athos Power Plant Solar + storage |
908 MW | Agreement signed |
| Mount Laguna Wind 2 Onshore wind |
400 MW | Agreement signed |
| Driftwood Stella Solar + storage |
400 MW | Agreement signed |
| Sonrisa Solar + storage |
384 MW | Agreement signed |
| Solar + storage project Q58, Kern County Solar + storage |
300 MW | In study |
| Heartland 2 Solar + storage |
228 MW | Agreement signed |
| Heartland 1 Solar + storage |
228 MW | Agreement signed |
| Baldy Mesa Solar + storage |
225 MW | Agreement signed |
| Aramis Power Plant Solar + storage |
203 MW | Agreement signed |
| Las Camas 1 Solar + storage |
203 MW | Agreement signed |
| Sandrini Sol 1 Solar + storage |
192 MW | Agreement signed |
| Redux Solar Solar + storage |
190 MW | Agreement signed |
| Sand Hill C Onshore wind |
84.3 MW | Agreement signed |
| Gonzaga Wind Farm Onshore wind |
80.0 MW | Agreement signed |
| Battery storage project Q62, Los Angeles County Battery storage |
75.0 MW | In study |
| Camino Solar Solar + storage |
58.3 MW | Agreement signed |
| Starlight Solar Solar + storage |
37.4 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)