United States βΊ Grid βΊ Interconnection queues βΊ California
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in California (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project Q19, Kern County Solar |
250 MW | |
| Re Astoria Solar |
175 MW | |
| PV2 Panoche Valley Solar (Aka Sge Panoche Valley Solar) Solar |
140 MW | |
| Solar project Q18, Kern County Solar |
100 MW | |
| Blue Hornet Solar Solar |
100 MW | |
| Lotus Solar Farm Solar |
50.0 MW | |
| Golden Hills 2 Wind Onshore wind |
36.0 MW | |
| North Lancaster Solar (Fka Western Antelope DRY Ranch Addition) Solar |
20.0 MW | |
| Kingbird Solar A (Fka Av Solar Ranch 2-A) Solar |
20.0 MW | |
| Burford Giffen Solar |
20.0 MW | |
| Frontier Solar Solar |
20.0 MW | |
| Kingbird Solar B (Fka Av Solar Ranch 2-B Solar |
20.0 MW | |
| Columbia Solar Energy 2 Fka Columbia Solar Energy II Solar |
20.0 MW | |
| Morelos Del Sol (Fka Twissleman I) Solar |
15.0 MW | |
| Vasco Wind Project Onshore wind |
3.1 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)