United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in SPP (Southwest Power Pool) (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown131,934 MW
Active in queue11.8 GW66 requests
Agreement signed11.4 GW64 requests
Withdrawn16232.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2017-009, Neosho County
Onshore wind
302 MWOperating Neosho, KSSPP Apr 20172021
Onshore wind project GEN-2017-010, Bowman County
Onshore wind
200 MWOperating Bowman, NDSPP Apr 20172025
Onshore wind project GEN-2017-033, Baylor County
Onshore wind
200 MWOperating Baylor, TXSPP May 20172024
Onshore wind project GEN-2017-094, Hand County
Onshore wind
200 MWOperating Hand, SDSPP May 20172023
Onshore wind project GEN-2017-005, Bourbon County
Onshore wind
190 MWOperating Bourbon, KSSPP Apr 20172021
Onshore wind project GEN-2017-060, Barton County
Onshore wind
149 MWOperating Barton, MOSPP May 20172021
Onshore wind project GEN-2017-082, Barton County
Onshore wind
149 MWOperating Barton, MOSPP May 20172020
Onshore wind project GEN-2017-027, Carter County
Onshore wind
140 MWOperating Carter, OKSPP May 20172021
Solar project GEN-2017-097, Pennington County
Solar
128 MWOperating Pennington, SDSPP May 20172024
Onshore wind project GEN-2017-047, Beaver County
Onshore wind
102 MWOperating Beaver, OKSPP May 20172024
Solar project GEN-2017-036, Kiowa County
Solar
100 MWOperating Kiowa, OKSPP May 20172025
Gas project ASGI-2015-004
Gas
56.0 MWOperating SPP Jan 20172015
Gas project GEN-2016-177, Gaines County
Gas
17.0 MWOperating Gaines, TXSPP Jan 20172021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)