| Project | Capacity | Status |
|---|---|---|
| South Branch Solar Solar |
205 MW | Paused / redesign |
| Wild Indigo Solar Solar |
150 MW | Paused / redesign |
| Cartersville Solar Solar |
99.9 MW | Paused / redesign |
| Windsor PVI Solar |
85.0 MW | Paused / redesign |
| Seven Bridges Solar Solar |
80.0 MW | Paused / redesign |
| Short Mountain Wind Energy Onshore wind |
80.0 MW | Paused / redesign |
| Circleville Solar Energy Solar |
70.0 MW | Paused / redesign |
| Sweetleaf Solar Solar |
60.0 MW | Paused / redesign |
| Chestnut Solar Solar |
60.0 MW | Paused / redesign |
| Steubenville Solar Solar |
49.5 MW | Paused / redesign |
| Sweetleaf Solar Solar |
33.0 MW | Paused / redesign |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Blue Creek Wind Farm Solar |
20.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)27 Β· 6,633 MW
- ERCOT (Texas)16 Β· 2,714 MW
- PJM (Mid-Atlantic, Midwest)14 Β· 1,032 MW
- Southeast (non-ISO utilities)11 Β· 843 MW
- NYISO (New York)6 Β· 749 MW
- SPP (Southwest Power Pool)2 Β· 330 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)