United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMCircleville Solar Energy
Circleville Solar Energy is a 70.0 MW solar request suspended in the PJM interconnection queue, in Pickaway County, Ohio, connecting to AEP.
Queue statusPaused / redesign
- PlanningQueued Feb 2017 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AC2-029
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Circleville 138kV
- Location
- Pickaway County, Ohio
- Technology
- Solar: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 2 February 2017
- Proposed online date
- December 2027
Location
Marker shows the centre of Pickaway County; the queue data does not give exact sites.
Other requests in Pickaway County
- Battery storage project AH2-228, Pickaway CountyBattery storage Β· 150 MW Β· in study
- Solar + storage project AH2-028, Pickaway CountySolar + storage Β· 44.0 MW Β· in study
- Solar project AH2-028A, Pickaway CountySolar Β· 20.0 MW Β· in study
- Other project AH2-006, Pickaway CountyOther Β· 14.2 MW Β· in study
- Buckeye Plains SolarSolar Β· 49.9 MW Β· built
- Pickaway County II SolarSolar Β· 49.9 MW Β· built
- Pickaway County SolarSolar Β· 49.9 MW Β· built
- Buckeye Plains II SolarSolar Β· 49.9 MW Β· built
- Darby Generation Station Units 1-6Gas Β· 9.0 MW Β· built
- Darby Generating StationGas Β· 9.0 MW Β· built
- Pickway #5Coal Β· 5.0 MW Β· built
- Gas project AC1-096, Pickaway CountyGas Β· 1,277 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem