United States › Grid › Interconnection queues › Ohio

GAS · PJM

Darby Generating Station

Darby Generating Station is a 9.0 MW gas request built and operating in the PJM interconnection queue, in Pickaway County, Ohio, connecting to Dayton.

Queue statusOperating
  1. PlanningQueued Jan 2006 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2006 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
P49
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Adkins 345kV
Location
Pickaway County, Ohio
Technology
Gas: 9.0 MW
Total requested
9.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
27 January 2006
Proposed online date
June 2006
Came online
June 2006

Location

Marker shows the centre of Pickaway County; the queue data does not give exact sites.