United States βΊ Grid βΊ Interconnection queues βΊ Ohio
COAL Β· PJMPickway #5
Pickway #5 is a 5.0 MW coal request built and operating in the PJM interconnection queue, in Pickaway County, Ohio, connecting to AEP.
Request details
- Queue ID
- R84
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Picway #5
- Location
- Pickaway County, Ohio
- Technology
- Coal: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 29 January 2007
- Proposed online date
- April 2007
- Came online
- April 2007
Location
Marker shows the centre of Pickaway County; the queue data does not give exact sites.
Other requests in Pickaway County
- Battery storage project AH2-228, Pickaway CountyBattery storage Β· 150 MW Β· in study
- Solar + storage project AH2-028, Pickaway CountySolar + storage Β· 44.0 MW Β· in study
- Solar project AH2-028A, Pickaway CountySolar Β· 20.0 MW Β· in study
- Other project AH2-006, Pickaway CountyOther Β· 14.2 MW Β· in study
- Circleville Solar EnergySolar Β· 70.0 MW Β· suspended
- Buckeye Plains SolarSolar Β· 49.9 MW Β· built
- Pickaway County II SolarSolar Β· 49.9 MW Β· built
- Pickaway County SolarSolar Β· 49.9 MW Β· built
- Buckeye Plains II SolarSolar Β· 49.9 MW Β· built
- Darby Generation Station Units 1-6Gas Β· 9.0 MW Β· built
- Darby Generating StationGas Β· 9.0 MW Β· built
- Gas project AC1-096, Pickaway CountyGas Β· 1,277 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem