🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Ohio

GAS · PJM

Darby Generation Station Units 1-6

Darby Generation Station Units 1-6 is a 9.0 MW gas request built and operating in the PJM interconnection queue, in Pickaway County, Ohio, connecting to Dayton.

Queue statusOperating
  1. PlanningQueued Sep 2006 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2007 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
R15
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Adkins 345kV
Location
Pickaway County, Ohio
Technology
Gas: 9.0 MW
Total requested
9.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
29 September 2006
Proposed online date
May 2007
Came online
May 2007

Location

Marker shows the centre of Pickaway County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Pickaway County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem