United States › Grid › Interconnection queues › West Virginia

ONSHORE WIND · PJM

Short Mountain Wind Energy

Short Mountain Wind Energy is a 80.0 MW onshore wind request suspended in the PJM interconnection queue, in Hardy County, West Virginia, connecting to APS.

Queue statusPaused / redesign
  1. PlanningQueued Sep 2017 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AD1-125
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Baker 138 kV
Location
Hardy County, West Virginia
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Suspended
Entered queue
28 September 2017
Proposed online date
December 2024

Location

Marker shows the centre of Hardy County; the queue data does not give exact sites.

Power plants in West Virginia · Transmission lines in West Virginia

Other requests in Hardy County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem