United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in North Carolina, PJM
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Macadamia Solar Solar |
300 MW | Agreement signed |
| Cherry Solar Solar |
180 MW | Agreement signed |
| Shawboro Solar Solar |
150 MW | Agreement signed |
| Solar project AH1-040, Washington County Solar Β· ACE Development Company, LLC |
150 MW | In study |
| Macadamia Solar Solar |
109 MW | Agreement signed |
| Swift Creek Solar Solar + storage |
100 MW | Agreement signed |
| Halifax County Solar Solar |
80.0 MW | Agreement signed |
| Currituck Solar Solar Β· Currituck Solar, LLC |
80.0 MW | Agreement signed |
| Pitt Solar Solar |
80.0 MW | Agreement signed |
| Sumac Solar Solar |
80.0 MW | Agreement signed |
| Solar project AG2-522, Warren County Solar Β· Horizon Solar East, LLC |
80.0 MW | In study |
| Macadamia Solar Solar |
75.0 MW | Agreement signed |
| Edgecome Solar Energy Center Solar |
75.0 MW | Paused / redesign |
| Solar project AG2-382, Bertie County Solar Β· Merry Hill PV I, LLC |
70.0 MW | In study |
| Albemarle Beach Solar Solar |
60.0 MW | Agreement signed |
| Sweetleaf Solar Solar |
60.0 MW | Paused / redesign |
| Solar project AH1-271, Bertie County Solar Β· Merry Hill PV I, LLC |
40.0 MW | In study |
| Sweetleaf Solar Solar |
33.0 MW | Paused / redesign |
| Solar project AH1-033, Currituck County Solar Β· Sligo Solar, LLC |
19.5 MW | In study |
| Solar + storage project AH2-384, Martin County Solar + storage |
10.0 MW | In study |
| Lillie Solar Solar |
9.4 MW | Agreement signed |
| NC3 Ahoskie South Solar Project Solar + storage |
5.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)159 Β· 18.8 GW
- PJM (Mid-Atlantic, Midwest)22 Β· 1,846 MW
- West (non-ISO utilities)1 Β· 275 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)