United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in North Carolina, PJM

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown221,846 MW
Active in queue1,846 MW22 requests
Agreement signed1,308 MW13 requests
Withdrawn13711.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

22 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Macadamia Solar
Solar
300 MWAgreement signed Washington, NCPJM Sep 2017target 2028
Cherry Solar
Solar
180 MWAgreement signed Northampton, NCPJM Oct 2016target 2025
Shawboro Solar
Solar
150 MWAgreement signed Currituck, NCPJM Jul 2018target 2027
Solar project AH1-040, Washington County
Solar Β· ACE Development Company, LLC
150 MWIn study Washington, NCPJM Feb 2025target 2025
Macadamia Solar
Solar
109 MWAgreement signed Washington, NCPJM Aug 2017target 2028
Swift Creek Solar
Solar + storage
100 MWAgreement signed Edgecombe, NCPJM Mar 2020target 2029
Halifax County Solar
Solar
80.0 MWAgreement signed Halifax, NCPJM Nov 2016target 2026
Currituck Solar
Solar Β· Currituck Solar, LLC
80.0 MWAgreement signed Currituck, NCPJM Jan 2020target 2031
Pitt Solar
Solar
80.0 MWAgreement signed Pitt, NCPJM Oct 2016target 2026
Sumac Solar
Solar
80.0 MWAgreement signed Bertie, NCPJM Jun 2017target 2028
Solar project AG2-522, Warren County
Solar Β· Horizon Solar East, LLC
80.0 MWIn study Warren, NCPJM Feb 2025target 2025
Macadamia Solar
Solar
75.0 MWAgreement signed Washington, NCPJM Aug 2017target 2028
Edgecome Solar Energy Center
Solar
75.0 MWPaused / redesign Edgecombe, NCPJM Aug 2016target 2025
Solar project AG2-382, Bertie County
Solar Β· Merry Hill PV I, LLC
70.0 MWIn study Bertie, NCPJM Feb 2025target 2024
Albemarle Beach Solar
Solar
60.0 MWAgreement signed Washington, NCPJM Jan 2019target 2026
Sweetleaf Solar
Solar
60.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Solar project AH1-271, Bertie County
Solar Β· Merry Hill PV I, LLC
40.0 MWIn study Bertie, NCPJM Feb 2025target 2024
Sweetleaf Solar
Solar
33.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Solar project AH1-033, Currituck County
Solar Β· Sligo Solar, LLC
19.5 MWIn study Currituck, NCPJM Feb 2025target 2024
Solar + storage project AH2-384, Martin County
Solar + storage
10.0 MWIn study Martin, NCPJM Mar 2022target 2026
Lillie Solar
Solar
9.4 MWAgreement signed Edgecombe, NCPJM May 2020target 2028
NC3 Ahoskie South Solar Project
Solar + storage
5.0 MWAgreement signed Hertford, NCPJM Jun 2020target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)