United States › Grid › Interconnection queues › North Carolina

SOLAR · PJM

Edgecome Solar Energy Center

Edgecome Solar Energy Center is a 75.0 MW solar request suspended in the PJM interconnection queue, in Edgecombe County, North Carolina, connecting to Dominion.

Queue statusPaused / redesign
  1. PlanningQueued Aug 2016 (current stage)
  2. ConsentedSep 2020 (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AC1-034
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Heartsease DP - Mayo Dunbar 115kV
Location
Edgecombe County, North Carolina
Technology
Solar: 75.0 MW
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Suspended
Entered queue
11 August 2016
Agreement signed
17 September 2020
Proposed online date
December 2025

Location

Marker shows the centre of Edgecombe County; the queue data does not give exact sites.

Power plants in North Carolina · Transmission lines in North Carolina

Other requests in Edgecombe County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem