United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ISO-NE (New England) (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Tiverton Uprate Gas |
306 MW | |
| Western Maine Wind Project Onshore wind |
58.8 MW | |
| Gravel Pit Solar Increase Solar |
45.0 MW | |
| Riley-Jay-Otis-Livermore Hydro |
28.3 MW | |
| Fuel Cell Gas |
14.4 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar + storage |
9.9 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar + storage |
9.5 MW | |
| Chase Hill Substation - NG Western RI DG Area Study Solar |
6.8 MW | |
| Syncarpha Blandford Solar plus battery storage Solar + storage |
5.0 MW | |
| ENA Old Falmouth Road PV + Storage Solar + storage |
4.8 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar + storage |
4.3 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar |
4.0 MW | |
| Combined Cycle Upgrade Gas |
4.0 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar + storage |
3.8 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
3.3 MW | |
| Cranberry Highway Solar + Battery Storage Solar + storage |
2.2 MW | |
| Bridgeport Harbor Unit #5 Uprate Gas |
0.4 MW | |
| Rumford Power Repair for Performance Upgrade Gas |
0.2 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)60 Β· 9,770 MW
- Southeast (non-ISO utilities)37 Β· 2,675 MW
- West (non-ISO utilities)23 Β· 1,014 MW
- SPP (Southwest Power Pool)8 Β· 1,006 MW
- ISO-NE (New England)18 Β· 510 MW
- PJM (Mid-Atlantic, Midwest)29 Β· 485 MW
- MISO (Midcontinent)2 Β· 295 MW
- CAISO (California)4 Β· 139 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)