United States › Grid › Interconnection queues › Maine
SOLAR · ISO-NEBowman Street 115 kV SS - Augusta Area Study
Bowman Street 115 kV SS - Augusta Area Study is a 3.3 MW solar request built and operating in the ISO-NE interconnection queue, in Kennebec County, Maine, connecting to CMP.
Request details
- Queue ID
- 1073
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP GARDINER Substation, Circuit 226D2
- Location
- Kennebec County, Maine
- Technology
- Solar: 3.3 MW
- Total requested
- 3.3 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 2 October 2020
- Proposed online date
- June 2022
Location
Marker shows the centre of Kennebec County; the queue data does not give exact sites.
Other requests in Kennebec County
- SolarSolar · 7.0 MW · agreement signed
- Bowman Street 115 kV SS - Augusta Area StudySolar + storage · 9.9 MW · built
- Bowman Street 115 kV SS - Augusta Area StudySolar + storage · 9.5 MW · built
- SolarSolar · 7.2 MW · built
- Augusta E. Side 115 kV SS - Augusta Area StudySolar + storage · 4.3 MW · built
- Augusta E. Side 115 kV SS - Augusta Area StudySolar · 4.0 MW · built
- Augusta E. Side 115 kV SS - Augusta Area StudySolar + storage · 3.8 MW · built
- Battery StorageBattery storage · 102 MW · withdrawn
- Winslow-County Rd Lakewood 115 kV SS - Winslow-County Rd-Lakewood 2 DG StudySolar · 21.0 MW · withdrawn
- SolarSolar · 20.0 MW · withdrawn
- SolarSolar · 20.0 MW · withdrawn
- Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG StudySolar + storage · 18.6 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem