United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Eagle Mountain Pump Storage #4 Battery storage |
1,408 MW | Withdrawn / abandoned |
| Morro Bay Wave Energy Project Other |
650 MW | Withdrawn / abandoned |
| Irish Gas |
600 MW | Withdrawn / abandoned |
| Rainbow Energy Center Gas |
523 MW | Withdrawn / abandoned |
| Midtown Canyon Gas Gas |
507 MW | Withdrawn / abandoned |
| Frazier Es Battery storage |
420 MW | Withdrawn / abandoned |
| Brisbane Es Battery storage |
412 MW | Withdrawn / abandoned |
| Bradmore BESS Fka Bradmore Es Battery storage |
412 MW | Withdrawn / abandoned |
| Palo Verde Energy Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Nevada Mohave Solar Solar |
400 MW | Withdrawn / abandoned |
| Royal (Fka Wheeler Indigo) Solar + storage |
360 MW | Withdrawn / abandoned |
| Beltran Solar Solar |
300 MW | Withdrawn / abandoned |
| Titan Solar Gas |
300 MW | Withdrawn / abandoned |
| Fresno Solar 1 Solar |
247 MW | Withdrawn / abandoned |
| Algoso Es Battery storage |
206 MW | Withdrawn / abandoned |
| Mikado Solar + storage |
206 MW | Withdrawn / abandoned |
| Mount Vernon Solar Solar |
200 MW | Withdrawn / abandoned |
| Ancho Creek Solar Solar |
200 MW | Withdrawn / abandoned |
| Palomas Solar Project Solar |
200 MW | Withdrawn / abandoned |
| Otay Mesa BESS Battery storage |
200 MW | Withdrawn / abandoned |
| Pistachio Energy Park Solar + storage |
191 MW | Withdrawn / abandoned |
| High Desert View Solar Solar + storage |
168 MW | Withdrawn / abandoned |
| Oakland Es Battery storage |
156 MW | Withdrawn / abandoned |
| Periwinkle Solar + storage |
155 MW | Withdrawn / abandoned |
| Alamo Springs Solar 1 Solar + storage |
154 MW | Withdrawn / abandoned |
| Tampadero Solar Solar |
150 MW | Withdrawn / abandoned |
| Harper Lake Energy Storage Battery storage |
140 MW | Withdrawn / abandoned |
| Sienna Solar + storage |
133 MW | Withdrawn / abandoned |
| Palmdale Energy Gas |
130 MW | Withdrawn / abandoned |
| American Kings 2 Solar |
120 MW | Withdrawn / abandoned |
| Harvest Energy Storage Project (Fka Otay Mesa MSS) Battery storage |
110 MW | Withdrawn / abandoned |
| Pio Pico Unit 4 Gas |
110 MW | Withdrawn / abandoned |
| Sidewinder Solar Solar |
109 MW | Withdrawn / abandoned |
| Bridgehead Es Battery storage |
103 MW | Withdrawn / abandoned |
| Golden Fields Solar 3 Solar |
100 MW | Withdrawn / abandoned |
| Midtown Canyon Es Battery storage |
100 MW | Withdrawn / abandoned |
| Snow Mountain Solar Solar |
100 MW | Withdrawn / abandoned |
| Kimberlina Solar Solar |
100 MW | Withdrawn / abandoned |
| White Wolf Solar Solar |
100 MW | Withdrawn / abandoned |
| Alamo Springs Solar 2 Solar + storage |
96.0 MW | Withdrawn / abandoned |
| Bonsall Renewable Solar + storage |
84.0 MW | Withdrawn / abandoned |
| Heirloom Renewable Solar + storage |
84.0 MW | Withdrawn / abandoned |
| Dos Amigos Solar Solar |
81.8 MW | Withdrawn / abandoned |
| Basket Ridge Solar Solar |
80.0 MW | Withdrawn / abandoned |
| Nicolaus Storage Battery storage |
64.0 MW | Withdrawn / abandoned |
| Jacumba Ranch Solar + storage |
60.3 MW | Withdrawn / abandoned |
| Central Valley Solar |
60.0 MW | Withdrawn / abandoned |
| Sand Hill Wind 2 Onshore wind |
52.5 MW | Withdrawn / abandoned |
| Gale Solar 1 Solar |
50.0 MW | Withdrawn / abandoned |
| Westlands Artichoke Solar |
50.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)231 Β· 27.2 GW
- MISO (Midcontinent)53 Β· 17.2 GW
- CAISO (California)91 Β· 12.3 GW
- SPP (Southwest Power Pool)72 Β· 11.1 GW
- ISO-NE (New England)46 Β· 7,500 MW
- West (non-ISO utilities)197 Β· 6,025 MW
- ERCOT (Texas)28 Β· 5,278 MW
- Southeast (non-ISO utilities)49 Β· 4,719 MW
- NYISO (New York)33 Β· 4,251 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)