πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9112.3 GW
Active in queue3,789 MW15 requests
Agreement signed3,789 MW15 requests
Withdrawn9112.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

91 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Eagle Mountain Pump Storage #4
Battery storage
1,408 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2022
Morro Bay Wave Energy Project
Other
650 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2015target 2020
Irish
Gas
600 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2020
Rainbow Energy Center
Gas
523 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Midtown Canyon Gas
Gas
507 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Frazier Es
Battery storage
420 MWWithdrawn / abandoned Tulare, CACAISO Apr 2015target 2021
Brisbane Es
Battery storage
412 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2015target 2021
Bradmore BESS Fka Bradmore Es
Battery storage
412 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2015target 2021
Palo Verde Energy Storage
Battery storage
400 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2020
Nevada Mohave Solar
Solar
400 MWWithdrawn / abandoned Clark, NVCAISO Apr 2015target 2024
Royal (Fka Wheeler Indigo)
Solar + storage
360 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2019
Beltran Solar
Solar
300 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2015target 2018
Titan Solar
Gas
300 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2015target 2020
Fresno Solar 1
Solar
247 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Algoso Es
Battery storage
206 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2021
Mikado
Solar + storage
206 MWWithdrawn / abandoned Imperial, CACAISO Apr 2015target 2018
Mount Vernon Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Ancho Creek Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Palomas Solar Project
Solar
200 MWWithdrawn / abandoned Yuma, AZCAISO Apr 2015target 2018
Otay Mesa BESS
Battery storage
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Pistachio Energy Park
Solar + storage
191 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
High Desert View Solar
Solar + storage
168 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2019
Oakland Es
Battery storage
156 MWWithdrawn / abandoned Alameda, CACAISO Apr 2015target 2021
Periwinkle
Solar + storage
155 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Alamo Springs Solar 1
Solar + storage
154 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2023
Tampadero Solar
Solar
150 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2021
Harper Lake Energy Storage
Battery storage
140 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2021
Sienna
Solar + storage
133 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2018
Palmdale Energy
Gas
130 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2015target 2022
American Kings 2
Solar
120 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2020
Harvest Energy Storage Project (Fka Otay Mesa MSS)
Battery storage
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Pio Pico Unit 4
Gas
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Sidewinder Solar
Solar
109 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2019
Bridgehead Es
Battery storage
103 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2015target 2021
Golden Fields Solar 3
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Midtown Canyon Es
Battery storage
100 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Snow Mountain Solar
Solar
100 MWWithdrawn / abandoned Clark, NVCAISO Apr 2015target 2019
Kimberlina Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
White Wolf Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Alamo Springs Solar 2
Solar + storage
96.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2023
Bonsall Renewable
Solar + storage
84.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
Heirloom Renewable
Solar + storage
84.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
Dos Amigos Solar
Solar
81.8 MWWithdrawn / abandoned Merced, CACAISO Apr 2015target 2020
Basket Ridge Solar
Solar
80.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Nicolaus Storage
Battery storage
64.0 MWWithdrawn / abandoned Sutter, CACAISO Apr 2015target 2020
Jacumba Ranch
Solar + storage
60.3 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2021
Central Valley
Solar
60.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2021
Sand Hill Wind 2
Onshore wind
52.5 MWWithdrawn / abandoned Alameda, CACAISO Apr 2015target 2017
Gale Solar 1
Solar
50.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Westlands Artichoke
Solar
50.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2021
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)