United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California) (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Descendant Ranch 1 Solar + storage |
1,024 MW | Agreement signed |
| Bellefield Solar Farm Solar + storage |
1,000 MW | Agreement signed |
| Centennial Flats Solar + storage |
767 MW | Agreement signed |
| Sanborn Solar 2 Solar + storage |
707 MW | Agreement signed |
| Key Storage 1 Battery storage |
309 MW | Agreement signed |
| Las Camas 3 Solar + storage |
203 MW | Agreement signed |
| Kettle Solar One Solar + storage |
180 MW | Agreement signed |
| Janus Solar + storage |
164 MW | Agreement signed |
| Saloon Energy Storage Battery storage |
150 MW | Agreement signed |
| Jasmine Solar + storage |
141 MW | Agreement signed |
| Baldy Mesa 2 Solar + storage |
125 MW | Agreement signed |
| Ajo Power Bank Battery storage |
124 MW | Agreement signed |
| Reclaimed Wind Battery storage |
114 MW | Agreement signed |
| Azalea Solar + storage |
99.3 MW | Agreement signed |
| Solano 4 Wind Onshore wind |
92.4 MW | Agreement signed |
| Chalan Solar Solar + storage |
91.8 MW | Agreement signed |
| Hummingbird Energy Storage Battery storage |
75.0 MW | Agreement signed |
| Mulqueeney Ranch Wind 2 Onshore wind |
62.5 MW | Agreement signed |
| Angela Solar + storage |
60.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)29 Β· 6,515 MW
- SPP (Southwest Power Pool)39 Β· 6,303 MW
- CAISO (California)19 Β· 5,488 MW
- West (non-ISO utilities)23 Β· 5,240 MW
- PJM (Mid-Atlantic, Midwest)34 Β· 4,211 MW
- MISO (Midcontinent)20 Β· 3,007 MW
- ISO-NE (New England)4 Β· 834 MW
- Southeast (non-ISO utilities)7 Β· 788 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)