United States β€Ί Grid β€Ί Interconnection queues β€Ί California

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in California, CAISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown376148.9 GW
Active in queue148.9 GW376 requests
Agreement signed81.1 GW213 requests
Withdrawn2,050551.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

376 requests Β· page 1 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Darden
Solar + storage
2,365 MWAgreement signed Fresno, CACAISO Apr 2021target 2028
Umbriel
Solar + storage
2,365 MWAgreement signed Imperial, CACAISO Apr 2021target 2035
Wingtip Solar 1
Solar + storage
2,352 MWAgreement signed Merced, CACAISO Apr 2021target 2032
Muon
Solar + storage
2,339 MWIn study Fresno, CACAISO Apr 2023target 2028
Angeleno Solar Farm
Solar + storage
2,300 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2028
Holman
Wind + storage
2,282 MWAgreement signed Monterey, CACAISO Apr 2021target 2034
Sanborn Hybrid 3
Solar + storage
2,159 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Quark
Solar + storage
2,045 MWIn study Fresno, CACAISO Apr 2023target 2028
Ripple
Solar + storage
1,880 MWIn study Kings, CACAISO Apr 2023target 2031
Buttonbush Solar Hybrid Energy Center
Solar + storage
1,636 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Plum
Solar + storage
1,560 MWIn study Kings, CACAISO Apr 2021target 2031
Sunflower
Solar + storage
1,430 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Broadview
Solar + storage
1,308 MWIn study Fresno, CACAISO Apr 2023target 2028
Euismod
Solar + storage
1,247 MWAgreement signed Kern, CACAISO Apr 2021target 2028
Potentia-Viridi
Other
1,225 MWAgreement signed San Joaquin, CACAISO Apr 2020target 2028
Matterhorn
Other
1,218 MWIn study Riverside, CACAISO Apr 2023target 2029
Solstice B
Solar + storage
1,211 MWIn study Fresno, CACAISO Apr 2023target 2031
Aviation
Gas
1,200 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Pion
Battery storage
1,168 MWIn study Fresno, CACAISO Apr 2023target 2028
Solstice A
Solar + storage
1,111 MWIn study Fresno, CACAISO Apr 2023target 2031
Hillside Energy Storage
Battery storage
1,065 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Musketeers
Solar + storage
1,047 MWIn study Tulare, CACAISO Apr 2023target 2029
Oberon
Solar + storage
1,037 MWAgreement signed Riverside, CACAISO Apr 2019target 2026
Crusade
Battery storage
1,029 MWIn study Orange, CACAISO Apr 2023target 2028
Lagoonez
Battery storage
1,029 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Windwalker Offshore
Offshore wind
1,029 MWAgreement signed San Luis Obispo, CACAISO Apr 2020target 2028
Sunbaked Solar
Solar + storage
1,024 MWAgreement signed Inyo, CACAISO Apr 2021target 2029
Descendant Ranch 1
Solar + storage
1,024 MWAgreement signed Colusa, CACAISO Apr 2018target 2034
Grace Energy Center
Solar + storage
1,017 MWAgreement signed Riverside, CACAISO Apr 2020target 2027
Bellefield Solar Farm
Solar + storage
1,000 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Bellefield 2 Solar Farm
Solar + storage
1,000 MWAgreement signed Kern, CACAISO Apr 2019target 2024
Pelicans Jaw Hybrid Solar
Solar + storage
1,000 MWAgreement signed Kings, CACAISO Apr 2019target 2028
Easley
Solar + storage
940 MWAgreement signed Riverside, CACAISO Apr 2021target 2028
Athos Power Plant
Solar + storage
908 MWAgreement signed Riverside, CACAISO May 2017target 2027
Invictus
Solar + storage
860 MWIn study Riverside, CACAISO Apr 2021target 2029
Amanece
Solar + storage
836 MWIn study Stanislaus, CACAISO Apr 2023target 2029
Carissalito Creek
Solar + storage
832 MWIn study Merced, CACAISO Apr 2023target 2030
Artemis
Solar + storage
825 MWIn study Kern, CACAISO Apr 2021target 2029
Valley Sunlight Refinery
Solar + storage
821 MWIn study Kings, CACAISO Apr 2021target 2032
Maravillosa 2
Solar + storage
812 MWIn study Kern, CACAISO Apr 2023target 2029
Solsken
Solar + storage
809 MWIn study Tulare, CACAISO Apr 2021target 2033
Lycan Solar
Solar + storage
800 MWAgreement signed Riverside, CACAISO Apr 2019target 2030
Scarlet
Solar + storage
800 MWAgreement signed Fresno, CACAISO Apr 2015target 2025
Calypso Solar
Solar + storage
800 MWAgreement signed Riverside, CACAISO Apr 2019target 2031
Irving Storage
Battery storage
783 MWAgreement signed Monterey, CACAISO May 2019target 2025
Antelope Solar 2
Solar + storage
782 MWAgreement signed Los Angeles, CACAISO Apr 2015target 2025
Silver Ridge Mount Signal
Solar + storage
750 MWAgreement signed Imperial, CACAISO Aug 20062019
CPC West
Wind + storage
750 MWAgreement signed Kern, CACAISO Mar 20062011
Stable
Solar + storage
750 MWIn study Fresno, CACAISO Apr 2023target 2031
Sunglow
Solar + storage
744 MWIn study Kings, CACAISO Apr 2023target 2030
Page 1 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)