🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in the USA — page 89

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6,8521,550.1 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6,852 requests · page 89 of 138
ProjectCapacityStatusLocationRegionQueuedOnline
Anawa La BESS
Solar + storage · Anawa La Solar LLC
104 MWIn study Hidalgo, TXERCOT Mar 2024target 2027
Bronze Quinta Storage
Battery storage · KCE TX 28, LLC
104 MWIn study Hidalgo, TXERCOT Jan 2022target 2028
Diamond Cowboy Storage
Battery storage · Diamond B Storage, LLC
104 MWIn study San Patricio, TXERCOT Apr 2024target 2028
Post Trail Energy
Battery storage · Post Trail Energy, LLC
104 MWIn study Matagorda, TXERCOT Sep 2024target 2028
Gatsby Energy Storage
Battery storage · Gatsby Energy Storage LLC
103 MWIn study Pecos, TXERCOT Feb 2024target 2027
Three Ranches BESS
Solar + storage · Three Ranches Energy LLC
103 MWIn study Brewster, TXERCOT Aug 2025target 2027
Rio Vista Storage
Solar + storage · Rio Vista Storage, LLC
103 MWIn study Pecos, TXERCOT Jun 2025target 2028
Shallow Valley Storage
Battery storage · Shallow Valley Storage, LLC
103 MWIn study Ward, TXERCOT Jul 2024target 2028
Pequin Energy Storage
Battery storage · Pequin Energy Storage, LLC
103 MWIn study Brazoria, TXERCOT Jan 2021target 2027
Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2
Gas
103 MWIn study Morton, NDMISO Jun 20192024
Hyacinth Storage
Battery storage · Hyacinth Storage, LLC
103 MWIn study Harris, TXERCOT Jul 2021target 2030
Tioga Pass
Battery storage
103 MWIn study San Joaquin, CACAISO Apr 2023target 2028
Atticus Energy Storage
Battery storage · Atticus Energy Storage
103 MWIn study Sutton, TXERCOT Mar 2024target 2027
Appaloosa Run BESS
Battery storage · APPALOOSA RUN STORAGE, LLC
103 MWIn study Upton, TXERCOT Mar 2022target 2026
Evans Creek Energy Storage
Battery storage · Evans Creek Energy Storage LLC
103 MWIn study Val Verde, TXERCOT Oct 2023target 2028
Onshore wind project AI1-006, Randolph County
Onshore wind
103 MWIn study Randolph, WVPJM Apr 2022target 2026
Black Bear Solar
Solar + storage · ESCONDIDO DRAW RESOURCES, LLC
103 MWIn study Crockett, TXERCOT Dec 2023target 2028
Massey Storage
Battery storage · Massey Storage, LLC
103 MWIn study Harris, TXERCOT Jul 2024target 2028
Wisdom BESS SLF
Solar + storage · Wisdom Green Energy LLC
103 MWIn study Pecos, TXERCOT Feb 2025target 2027
Bonita Bateria
Battery storage
103 MWIn study Orange, CACAISO Apr 2023target 2029
Firebird BESS
Battery storage · TX BESS 6, LLC
103 MWIn study Ector, TXERCOT Nov 2023target 2028
Millennium Energy Storage
Battery storage
103 MWPaused / redesign Martin, TXERCOT May 2023
Solar project 20181030002, Charleston County
Solar
103 MWIn study Charleston, SCSoutheast target 2021
Madrone Energy Storage
Battery storage
103 MWPaused / redesign Comal, TXERCOT Jan 2021
Estonian Storage
Other · 249RD 8ME
103 MWPaused / redesign Delta, TXERCOT Jan 2020target 2022
Roost Energy Storage
Battery storage · Bluff Creek Energy Storage LLC
102 MWIn study Scurry, TXERCOT Jan 2023target 2027
Holstein 2 Energy Storage
Solar + storage · 229HD 8me LLC
102 MWIn study Nolan, TXERCOT Aug 2019target 2027
Big Five Storage
Battery storage · TX BESS 3 LLC
102 MWIn study Hidalgo, TXERCOT May 2023target 2028
Cassia
Battery storage
102 MWIn study San Joaquin, CACAISO Apr 2023target 2031
Arges BESS
Battery storage
102 MWIn study Solano, CACAISO Apr 2021target 2029
Gas project GEN-2024-003, Franklin County
Gas
102 MWIn study Franklin, ARSPP Apr 20242025
Prairie Horizon Energy Storage 4
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Blackland Prairie 1 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
watermelon 6 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
watermelon 2 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Edgewood BESS 2
Battery storage · Tempus Power management LLC
102 MWIn study Van Zandt, TXERCOT Jan 2025target 2028
Pioneer Path Energy Storage 1
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 1 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
watermelon 3 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Prairie Horizon Energy Storage 3
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Pioneer Path Energy Storage 2
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Pioneer Path Energy Storage 4
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 4 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Prairie Horizon Energy Storage 1
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Solar project GEN-2021-027, Lancaster County
Solar
102 MWIn study Lancaster, NESPP May 2021target 2026
Blackland Prairie 2 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
watermelon 5 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
Pioneer Path Energy Storage 3
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 8 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
Prairie Horizon Energy Storage 2
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Page 89 of 138

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)