United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Completed queue projects in the USA — page 87

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4,787563.7 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4,787 requests · page 87 of 96
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 488, Beaver County
Solar · Buckhorn Solar, LLC
3.0 MWOperating Beaver, UTWest Mar 2013target 2015
Onshore wind project 375, Elmore County
Onshore wind
3.0 MWOperating Elmore, IDWest Jun 20112012
Harmony Solar Farm
Solar
3.0 MWOperating Warren, NJPJM Apr 20102015
Stewarts Bridge Hydro
Hydro · Brookfield Renewable Power
3.0 MWOperating NYNYISO Aug 2010
MESA 2 Energy Storage Project
Battery storage
3.0 MWOperating Snohomish, WAWest Jan 2015target 2015
Solar project 493, Beaver County
Solar · Milford Flat Solar, LLC
3.0 MWOperating Beaver, UTWest Mar 2013target 2015
Hydro project 372, Jefferson County
Hydro · Apple, Inc.
3.0 MWOperating Jefferson, ORWest Feb 2011target 2015
Hydro project hist_q5, Ada County
Hydro
3.0 MWOperating Ada, IDWest target 2004
Frenchtown 1 Solar
Solar
3.0 MWOperating Hunterdon, NJPJM Jan 20102011
Other project G058, Grant County
Other
3.0 MWOperating Grant, SDMISO Sep 20002001
Solar project 511, Malheur County
Solar · Adapture Renewables
3.0 MWOperating Malheur, ORWest Jan 2016target 2016
Solar project 532, Malheur County
Solar · Verde Light Community Solar, LLC
3.0 MWOperating Malheur, ORWest May 20182023
Owens Corning Solar
Solar
3.0 MWOperating Camden, NJPJM Oct 20112017
Granger Electric of Hancock County
Other
3.0 MWOperating Hancock, OHPJM Nov 20092015
Solar project 632, Beaver County
Solar · Thermo No. 1 BE-01, LLC
3.0 MWOperating Beaver, UTWest Nov 2014target 2017
Other project 194, Jackson County
Other · Oregon Environmental Industries, LLC
2.9 MWOperating Jackson, ORWest Feb 2008
Vernon Station Incremental Capacity Increase
Hydro
2.9 MWOperating Windham, VTISO-NE Apr 2018target 2019
Lumberton SP
Solar
2.9 MWOperating Burlington, NJPJM Nov 20092010
Matrix-Stults Road
Solar
2.9 MWOperating Middlesex, NJPJM Oct 20102011
Solar project 502, Beaver County
Solar · REUT Origination, LLC
2.9 MWOperating Beaver, UTWest Jun 2013target 2015
Legler Landfill Solar Farm
Solar
2.9 MWOperating Ocean, NJPJM Oct 20152021
Solar project 459, Beaver County
Solar · REUT Origination, LLC
2.9 MWOperating Beaver, UTWest Jan 2013target 2015
Hydro project 571, Twin Falls County
Hydro · Little Wood River Irrigation District
2.9 MWOperating Twin Falls, IDWest Oct 2019target 2019
Solar project 624, Klamath County
Solar · Klamath Falls Solar 2, LLC
2.9 MWOperating Klamath, ORWest Oct 2014target 2017
Chula Vista Energy Center Expansion
Gas
2.8 MWOperating San Diego, CACAISO Mar 20212022
Solar project W2-071, Burlington County
Solar
2.8 MWOperating Burlington, NJPJM Jul 20102011
Hydro project 679, Twin Falls County
Hydro · Lower Lowline LLC
2.8 MWOperating Twin Falls, IDWest Oct 2022target 2023
Other project LOL2, Twin Falls County
Other
2.8 MWOperating Twin Falls, IDWest
Hydro project 339, Lewis And Clark County
Hydro
2.7 MWOperating Lewis And Clark, MTWest Jan 20182018
Worcester South
Solar
2.6 MWOperating Worcester, MDPJM Apr 20142019
Kettle Run
Solar
2.6 MWOperating Burlington, NJPJM Feb 20182023
McKee City Solar
Solar
2.6 MWOperating Atlantic, NJPJM Jan 20102011
Leicester - NG Western MA Area Cluster Study
Solar
2.6 MWOperating Worcester, MAISO-NE Dec 2018target 2021
Twin Branch Solar Facility
Solar
2.6 MWOperating St. Joseph, INPJM Apr 20142016
Hydro project 579, Twin Falls County
Hydro · Lateral 10 Venture
2.6 MWOperating Twin Falls, IDWest Apr 2020target 2020
Sparrow Point
Gas
2.5 MWOperating Baltimore, MDPJM Sep 20002001
Hydro project 596, Twin Falls County
Hydro · Crystal Springs Hydroelectric, L.P.
2.5 MWOperating Twin Falls, IDWest Jun 2020target 2021
Hydro project 522, Twin Falls County
Hydro · Shorock Hydro, LLC
2.5 MWOperating Twin Falls, IDWest May 2017target 2018
Deer Creek Solar Facility
Solar
2.5 MWOperating Grant, INPJM Apr 20142016
Bear Swamp Upper Yard substation - NG Western MA Area Cluster Study
Solar
2.5 MWOperating Berkshire, MAISO-NE Mar 2019target 2021
Blossburg Station Unit 1
Gas
2.5 MWOperating Tioga, PAPJM Sep 20192020
Westwood Generation
Coal
2.5 MWOperating Bucks, PAPJM Jul 20082008
Fairhaven Battery Energy Storage System
Battery storage
2.5 MWOperating Anne Arundel, MDPJM Jul 20202024
Wyman Hydro Uprate U1
Hydro
2.5 MWOperating Somerset, MEISO-NE May 2011target 2016
Onshore wind project GEN-2016-131, Grady County
Onshore wind
2.5 MWOperating Grady, OKSPP Nov 20162021
Rollins Avenue Phoenix
Solar
2.5 MWOperating Prince George's, MDPJM Apr 20162019
Pennsauken Solar 3
Solar
2.5 MWOperating Camden, NJPJM Aug 20162017
Solar project V4-073, Montgomery County
Solar
2.5 MWOperating Montgomery, OHPJM Jan 20102010
Emporia Hydro
Hydro
2.5 MWOperating Greensville, VAPJM Feb 20062007
Niagara Power Plant Dam
Hydro
2.4 MWOperating Roanoke, VAPJM Sep 20182020
Page 87 of 96

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)