Sparrow Point

Sparrow Point is a 2.5 MW gas request built and operating in the PJM interconnection queue, in Baltimore County, Maryland, connecting to BGE.

Queue statusOperating
  1. PlanningQueued Sep 2000 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2001 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
E05
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
BGE
Connection point (POI)
Bethlehem Steel 33kV
Location
Baltimore County, Maryland
Technology
Gas: 2.5 MW
Total requested
2.5 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
14 September 2000
Proposed online date
January 2001
Came online
January 2001

Location

Marker shows the centre of Baltimore County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Baltimore County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem