United States › Grid › Interconnection queues › Maryland
OTHER · PJMOtter Point LF-1
Otter Point LF-1 is a 4.5 MW other request built and operating in the PJM interconnection queue, in Baltimore County, Maryland, connecting to BGE.
Request details
- Queue ID
- M19
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Otter Point
- Location
- Baltimore County, Maryland
- Technology
- Other: 4.5 MW
- Total requested
- 4.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 25 June 2004
- Agreement signed
- 25 April 2005
- Proposed online date
- September 2006
- Came online
- September 2006
Location
Marker shows the centre of Baltimore County; the queue data does not give exact sites.
Other requests in Baltimore County
- Pulaski Energy StorageBattery storage · 135 MW · in study
- Battery storage project AI1-189, Baltimore CountyBattery storage · 110 MW · in study
- Battery storage project AI1-130, Baltimore CountyBattery storage · 75.0 MW · in study
- Battery storage project AI1-131, Baltimore CountyBattery storage · 75.0 MW · in study
- Owings MillsGas · 9.0 MW · built
- Eastern Landfill GasOther · 4.0 MW · built
- Sparrow PointGas · 2.5 MW · built
- Gas project H05, Baltimore CountyGas · 600 MW · withdrawn
- Battery storage project AJ1-037, Baltimore CountyBattery storage · 300 MW · withdrawn
- Battery storage project AH1-736, Baltimore CountyBattery storage · 300 MW · withdrawn
- Gas project U1-036, Baltimore CountyGas · 220 MW · withdrawn
- Battery storage project AF1-037, Baltimore CountyBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem