United States βΊ Grid βΊ Interconnection queues βΊ Maryland
GAS Β· PJMOwings Mills
Owings Mills is a 9.0 MW gas request built and operating in the PJM interconnection queue, in Baltimore County, Maryland, connecting to BGE.
Request details
- Queue ID
- H13
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Dolfield
- Location
- Baltimore County, Maryland
- Technology
- Gas: 9.0 MW
- Total requested
- 9.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 27 November 2001
- Agreement signed
- 3 July 2002
- Proposed online date
- June 2004
- Came online
- June 2004
Location
Marker shows the centre of Baltimore County; the queue data does not give exact sites.
Other requests in Baltimore County
- Pulaski Energy StorageBattery storage Β· 135 MW Β· in study
- Battery storage project AI1-189, Baltimore CountyBattery storage Β· 110 MW Β· in study
- Battery storage project AI1-130, Baltimore CountyBattery storage Β· 75.0 MW Β· in study
- Battery storage project AI1-131, Baltimore CountyBattery storage Β· 75.0 MW Β· in study
- Otter Point LF-1Other Β· 4.5 MW Β· built
- Eastern Landfill GasOther Β· 4.0 MW Β· built
- Sparrow PointGas Β· 2.5 MW Β· built
- Gas project H05, Baltimore CountyGas Β· 600 MW Β· withdrawn
- Battery storage project AJ1-037, Baltimore CountyBattery storage Β· 300 MW Β· withdrawn
- Battery storage project AH1-736, Baltimore CountyBattery storage Β· 300 MW Β· withdrawn
- Gas project U1-036, Baltimore CountyGas Β· 220 MW Β· withdrawn
- Battery storage project AF1-037, Baltimore CountyBattery storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem