🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Completed queue projects in Texas — page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown43160.3 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

431 requests · page 8 of 9
ProjectCapacityStatusLocationRegionQueuedOnline
LEVEE (Freeport LNG)
Gas · Freeport LNG
11.0 MWOperating Brazoria, TXERCOT Dec 20112019
Lonestar BESS
Other
10.0 MWOperating Ward, TXERCOT 2022
Gomez BESS
Other
10.0 MWOperating Pecos, TXERCOT 2023
Goodwin BESS
Battery storage
10.0 MWOperating Hidalgo, TXERCOT 2025
Pauline BESS
Other · HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Henderson, TXERCOT Jun 20232024
Mustang Bayou BESS
Battery storage
10.0 MWOperating Brazoria, TXERCOT 2025
BRP Pueblo II BESS
Other
10.0 MWOperating Maverick, TXERCOT 2022
North Mercedes BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2023
Diboll Bess
Other
10.0 MWOperating Angelina, TXERCOT 2024
North Alamo BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2023
Holcomb BESS (Burro BESS)
Other
10.0 MWOperating La Salle, TXERCOT 2023
Val Verde BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2024
Garden City East BESS
Other · HEN Infrastructure, LLC 2
10.0 MWOperating Glasscock, TXERCOT Jan 20232024
Lufkin South BESS
Other · HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Angelina, TXERCOT Jun 20232024
Rodeo Ranch Energy Storage Repowering
Battery storage
10.0 MWOperating Reeves, TXERCOT Aug 20232025
BRP Pueblo I BESS
Other
10.0 MWOperating Maverick, TXERCOT 2022
West Harlingen BESS
Other
10.0 MWOperating Cameron, TXERCOT 2023
Elsa BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2023
Telview BESS
Other
10.0 MWOperating Fort Bend, TXERCOT 2024
Screwbean BESS
Other
10.0 MWOperating Culberson, TXERCOT 2023
Sandlake BESS
Other
10.0 MWOperating Reeves, TXERCOT 2024
BRP Zapata II BESS
Other
10.0 MWOperating Zapata, TXERCOT 2022
Rattlesnake BESS
Other
10.0 MWOperating Ward, TXERCOT 2022
Los Fresnos BESS
Other
10.0 MWOperating Cameron, TXERCOT 2023
Rio Grande City BESS
Other
10.0 MWOperating Starr, TXERCOT 2023
Prairie Creek BESS
Battery storage · SMT Dallas LLC
10.0 MWOperating Dallas, TXERCOT Jan 20242025
Hamilton BESS
Other
10.0 MWOperating Val Verde, TXERCOT 2024
Crockett BESS1
Other · ESTX-PLD-HOUSTON1, LLC
10.0 MWOperating Harris, TXERCOT Mar 20242024
Wharton BESS
Battery storage · I-eye Storage LLC
10.0 MWOperating Wharton, TXERCOT Nov 20222025
Pearsall BESS
Battery storage
10.0 MWOperating Frio, TXERCOT 2025
Judkins BESS
Other · HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Ector, TXERCOT Jun 20232024
Olney BESS
Other
10.0 MWOperating Young, TXERCOT 2023
Santa Rosa BESS
Other
10.0 MWOperating Cameron, TXERCOT 2023
Catarina BESS (La Huerta BESS)
Other
10.0 MWOperating Dimmit, TXERCOT 2022
Mineral Wells East BESS
Other · HEN Infrastructure, LLC 2
10.0 MWOperating Palo Pinto, TXERCOT Jan 20232024
Cedarvale BESS
Other
10.0 MWOperating Reeves, TXERCOT 2022
Coyote Springs BESS
Other
10.0 MWOperating Reeves, TXERCOT 2022
Junction BESS
Other
10.0 MWOperating Kimble, TXERCOT 2023
Bay City BESS
Other
10.0 MWOperating Matagorda, TXERCOT 2023
BRP Zapata I BESS
Other
10.0 MWOperating Zapata, TXERCOT 2022
BRP Lopeno BESS
Other
10.0 MWOperating Zapata, TXERCOT 2022
Garceno BESS
Other
10.0 MWOperating Starr, TXERCOT 2023
Midway1 BESS
Other · Midway BESS Station LLC
10.0 MWOperating Ector, TXERCOT May 20232023
Saddleback BESS
Other
10.0 MWOperating Reeves, TXERCOT 2022
Saragosa BESS1 (Matta Power Station)
Other
10.0 MWOperating Reeves, TXERCOT 2022
Mayberry II BESS
Battery storage · SMT Mission II LLC
10.0 MWOperating Hidalgo, TXERCOT Jan 20242025
Faulkner BESS
Other
10.0 MWOperating Reeves, TXERCOT 2022
Mayberry BESS
Other
10.0 MWOperating Cameron, TXERCOT 2023
Farmersville West BESS 2
Battery storage · SBESS TX 7 LLC
9.9 MWOperating Collin, TXERCOT Jun 20232025
Regis Palacios BESS
Other · Regis Palacios, LLC
9.9 MWOperating Matagorda, TXERCOT Apr 20232024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)