BATTERY STORAGE · ERCOTPrairie Creek BESS
Prairie Creek BESS is a 10.0 MW battery storage request built and operating in the ERCOT interconnection queue, in Dallas County, Texas.
Request details
- Queue ID
- 24INR0662
- Grid region
- ERCOT (Texas)
- Developer
- SMT Dallas LLC
- Connection point (POI)
- Station Name: PRCK_x000D_ Load Name: LDLXFMR4_x000D_ XFMR Number: 4_x000D_ Bus number: 2762_x000D_ Voltage: 138 kV
- Location
- Dallas County, Texas
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Operational
- Entered queue
- 25 January 2024
- Agreement signed
- 20 May 2024
- Proposed online date
- September 2025
- Came online
- July 2025
Location
Marker shows the centre of Dallas County; the queue data does not give exact sites.
Other requests in Dallas County
- Empire Central BESSBattery storage · 10.0 MW · agreement signed
- Thunder Road Energy StorageBattery storage · 153 MW · in study
- watermelon 6 energy storageBattery storage · 102 MW · in study
- watermelon 2 energy storageBattery storage · 102 MW · in study
- watermelon 1 energy storageBattery storage · 102 MW · in study
- watermelon 3 energy storageBattery storage · 102 MW · in study
- watermelon 4 energy storageBattery storage · 102 MW · in study
- watermelon 5 energy storageBattery storage · 102 MW · in study
- watermelon 8 energy storageBattery storage · 102 MW · in study
- watermelon 7 energy storageBattery storage · 102 MW · in study
- Atlanta TxHSR TPSS DS-1Other · 50.0 MW · in study
- Best Southwest BESSBattery storage · 241 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem