United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas) (2025 requests) β€” page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown361104.0 GW
Active in queue104.0 GW361 requests
Agreement signed4,428 MW22 requests
Withdrawn172,075 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

361 requests Β· page 8 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Meadow Park BESS
Battery storage Β· Meadow Park ESS Assets, LLC
10.0 MWAgreement signed Tarrant, TXERCOT Jun 2025target 2026
Alamo Street BESS
Battery storage Β· Alamo Clean Energy Center, LLC
10.0 MWAgreement signed Pecos, TXERCOT Apr 2025target 2026
Berry BESS1
Battery storage Β· ESTX-PLD-HOUSTON8, LLC
10.0 MWAgreement signed Harris, TXERCOT Feb 2025target 2025
North Edinburg BESS 1
Battery storage Β· Edinburg ESS Assets LLC
10.0 MWAgreement signed Hidalgo, TXERCOT May 2025target 2026
Hovey Solar 2
Solar Β· BARILLA SOLAR, LLC
7.5 MWIn study ERCOT Nov 2025target 2026
Roadrunner Crossing Wind (Uprate)
Wind + storage Β· Roadrunner Wind, LLC
3.3 MWIn study Eastland, TXERCOT Dec 2025target 2026
Ashra Storage SLF
Solar + storage Β· Ashra Solar, LLC
1.6 MWIn study Uvalde, TXERCOT Apr 2025target 2028
Kickstart Energy Storage IV
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage III
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage I
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage II
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Page 8 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)