Requests shown19492.4 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

194 requests · page 4 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Lycan Solar 2
Solar
192 MWIn study Riverside, CACAISO Apr 2023target 2028
Conaway Hybrid Power Plant
Solar + storage
170 MWIn study Yolo, CACAISO Apr 2020target 2023
Hacienda
Solar
157 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Argenta
Solar
156 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Zinfandel Storage Center
Battery storage
154 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Bobor Storage
Battery storage
152 MWIn study Tulare, CACAISO Apr 2021target 2030
Flores Storage
Battery storage
152 MWIn study Madera, CACAISO Apr 2021target 2031
Reflex
Solar
129 MWIn study Riverside, CACAISO Apr 2023target 2029
Holly Oaks
Battery storage
128 MWIn study Calaveras, CACAISO Apr 2023target 2028
El Rey Power Bank
Battery storage
124 MWIn study Monterey, CACAISO Apr 2021target 2029
Bonita Bateria 2
Battery storage
123 MWIn study Orange, CACAISO Apr 2023target 2029
Wildhorse Energy Center
Battery storage
122 MWIn study Sonoma, CACAISO Apr 2021target 2030
High Winds Storage
Battery storage
121 MWIn study Solano, CACAISO Apr 2021target 2031
Sienna Solar 2
Solar + storage
112 MWIn study San Bernardino, CACAISO Apr 2021target 2029
Toland Renewable Energy Park
Onshore wind
108 MWIn study Solano, CACAISO Apr 2023target 2029
Voyager Energy Storage
Battery storage
105 MWIn study Kern, CACAISO Apr 2023target 2027
Ulua
Battery storage
105 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Nelson
Solar
104 MWIn study Nye, NVCAISO Apr 2023target 2031
Tioga Pass
Battery storage
103 MWIn study San Joaquin, CACAISO Apr 2023target 2028
Bonita Bateria
Battery storage
103 MWIn study Orange, CACAISO Apr 2023target 2029
Cassia
Battery storage
102 MWIn study San Joaquin, CACAISO Apr 2023target 2031
Arges BESS
Battery storage
102 MWIn study Solano, CACAISO Apr 2021target 2029
Pajaro Valley Storage
Battery storage
102 MWIn study San Diego, CACAISO Apr 2021target 2030
Droga
Battery storage
102 MWIn study Merced, CACAISO Apr 2023target 2028
Eiger Energy Storage
Battery storage
101 MWIn study Kern, CACAISO Apr 2021target 2032
Valetudo Energy Storage
Battery storage
79.6 MWIn study Madera, CACAISO Apr 2021target 2028
Palmetto Energy Storage
Battery storage
75.6 MWIn study Alameda, CACAISO Apr 2021target 2030
Tarragon Hybrid
Solar + storage
71.9 MWIn study Fresno, CACAISO Apr 2021target 2028
Hammerhead Storage
Battery storage
71.3 MWIn study San Diego, CACAISO Apr 2021target 2030
Off Stream Water Storage
Battery storage
68.9 MWIn study Colusa, CACAISO Apr 2023target 2030
Box
Solar
63.4 MWIn study Riverside, CACAISO Apr 2023target 2029
Little Hill
Battery storage
63.1 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Prospect Energy Storage
Battery storage
58.8 MWPaused / redesign Sacramento, CACAISO Apr 2018target 2028
Mayacamas Geothermal
Geothermal
53.0 MWIn study Sonoma, CACAISO Apr 2021target 2030
Scafell Storage
Battery storage
52.0 MWIn study San Diego, CACAISO Apr 2020target 2029
Geranium Energy Storage
Battery storage
51.4 MWIn study San Diego, CACAISO Apr 2021target 2029
Township Power Bank
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Verbena Energy Storage
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Kifer BESS 1
Battery storage
50.0 MWIn study Santa Clara, CACAISO Apr 2021target 2025
Air Station 1
Solar + storage
42.1 MWIn study Kings, CACAISO Apr 2019target 2021
Hidden Knolls BESS
Battery storage
30.8 MWIn study Kern, CACAISO Apr 2021target 2028
Agua Caliente Solar 2
Solar
20.0 MWIn study Maricopa, AZCAISO Mar 2016target 2016
Separator Expansion
Battery storage
12.6 MWIn study San Bernardino, CACAISO Apr 2023target 2025
Milpa Power Bank
Battery storage
3.0 MWIn study Santa Clara, CACAISO Apr 2018target 2025
Page 4 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)