United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in CAISO (California) — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lycan Solar 2 Solar |
192 MW | In study |
| Conaway Hybrid Power Plant Solar + storage |
170 MW | In study |
| Hacienda Solar |
157 MW | In study |
| Argenta Solar |
156 MW | In study |
| Zinfandel Storage Center Battery storage |
154 MW | In study |
| Bobor Storage Battery storage |
152 MW | In study |
| Flores Storage Battery storage |
152 MW | In study |
| Reflex Solar |
129 MW | In study |
| Holly Oaks Battery storage |
128 MW | In study |
| El Rey Power Bank Battery storage |
124 MW | In study |
| Bonita Bateria 2 Battery storage |
123 MW | In study |
| Wildhorse Energy Center Battery storage |
122 MW | In study |
| High Winds Storage Battery storage |
121 MW | In study |
| Sienna Solar 2 Solar + storage |
112 MW | In study |
| Toland Renewable Energy Park Onshore wind |
108 MW | In study |
| Voyager Energy Storage Battery storage |
105 MW | In study |
| Ulua Battery storage |
105 MW | In study |
| Nelson Solar |
104 MW | In study |
| Tioga Pass Battery storage |
103 MW | In study |
| Bonita Bateria Battery storage |
103 MW | In study |
| Cassia Battery storage |
102 MW | In study |
| Arges BESS Battery storage |
102 MW | In study |
| Pajaro Valley Storage Battery storage |
102 MW | In study |
| Droga Battery storage |
102 MW | In study |
| Eiger Energy Storage Battery storage |
101 MW | In study |
| Valetudo Energy Storage Battery storage |
79.6 MW | In study |
| Palmetto Energy Storage Battery storage |
75.6 MW | In study |
| Tarragon Hybrid Solar + storage |
71.9 MW | In study |
| Hammerhead Storage Battery storage |
71.3 MW | In study |
| Off Stream Water Storage Battery storage |
68.9 MW | In study |
| Box Solar |
63.4 MW | In study |
| Little Hill Battery storage |
63.1 MW | In study |
| Prospect Energy Storage Battery storage |
58.8 MW | Paused / redesign |
| Mayacamas Geothermal Geothermal |
53.0 MW | In study |
| Scafell Storage Battery storage |
52.0 MW | In study |
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Air Station 1 Solar + storage |
42.1 MW | In study |
| Hidden Knolls BESS Battery storage |
30.8 MW | In study |
| Agua Caliente Solar 2 Solar |
20.0 MW | In study |
| Separator Expansion Battery storage |
12.6 MW | In study |
| Milpa Power Bank Battery storage |
3.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)