United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 24
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Post Trail Energy Battery storage · Post Trail Energy, LLC |
104 MW | In study |
| Gatsby Energy Storage Battery storage · Gatsby Energy Storage LLC |
103 MW | In study |
| Three Ranches BESS Solar + storage · Three Ranches Energy LLC |
103 MW | In study |
| Rio Vista Storage Solar + storage · Rio Vista Storage, LLC |
103 MW | In study |
| Shallow Valley Storage Battery storage · Shallow Valley Storage, LLC |
103 MW | In study |
| Pequin Energy Storage Battery storage · Pequin Energy Storage, LLC |
103 MW | In study |
| Hyacinth Storage Battery storage · Hyacinth Storage, LLC |
103 MW | In study |
| Atticus Energy Storage Battery storage · Atticus Energy Storage |
103 MW | In study |
| Appaloosa Run BESS Battery storage · APPALOOSA RUN STORAGE, LLC |
103 MW | In study |
| Evans Creek Energy Storage Battery storage · Evans Creek Energy Storage LLC |
103 MW | In study |
| Black Bear Solar Solar + storage · ESCONDIDO DRAW RESOURCES, LLC |
103 MW | In study |
| Massey Storage Battery storage · Massey Storage, LLC |
103 MW | In study |
| Wisdom BESS SLF Solar + storage · Wisdom Green Energy LLC |
103 MW | In study |
| Firebird BESS Battery storage · TX BESS 6, LLC |
103 MW | In study |
| Millennium Energy Storage Battery storage |
103 MW | Paused / redesign |
| Madrone Energy Storage Battery storage |
103 MW | Paused / redesign |
| Estonian Storage Other · 249RD 8ME |
103 MW | Paused / redesign |
| Roost Energy Storage Battery storage · Bluff Creek Energy Storage LLC |
102 MW | In study |
| Holstein 2 Energy Storage Solar + storage · 229HD 8me LLC |
102 MW | In study |
| Big Five Storage Battery storage · TX BESS 3 LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 1 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 6 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 2 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Edgewood BESS 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 1 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 3 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 4 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 2 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 5 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 8 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Edgewood BESS 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 7 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Blackland Prairie 3 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| San Bernard Solar II Solar · San Bernard Solar II, LLC |
102 MW | Paused / redesign |
| Opuntia Solar SLF Solar + storage · Opuntia Solar, LLC |
102 MW | In study |
| Crocus Solar Solar + storage · Crocus Solar, LLC |
102 MW | In study |
| Roxton Storage Solar + storage · Roxton Solar, LLC |
102 MW | In study |
| Half Moon 2 BESS Battery storage |
102 MW | Paused / redesign |
| Kurtz Solar SLF Solar + storage · Kurtz Solar, LLC |
102 MW | In study |
| Pisgah Ridge Solar 2 Solar + storage · Pisgah Ridge Solar 2, LLC |
102 MW | In study |
| Myers Solar Solar + storage · BT Myers Solar, LLC |
102 MW | In study |
| Kennedy Solar Solar + storage · Kennedy Bypass Solar LLC |
102 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)