United States › Grid › Interconnection queues › Vermont
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Vermont — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
12.0 MW | Withdrawn / abandoned |
| Diesel generation Other |
10.3 MW | Withdrawn / abandoned |
| Diesel Other |
9.1 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
9.0 MW | Withdrawn / abandoned |
| Wind ( increase in queue position 266) Onshore wind |
8.5 MW | Withdrawn / abandoned |
| Solar Solar |
8.1 MW | Withdrawn / abandoned |
| East Haven Wind Farm Onshore wind |
6.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
2.2 MW | Withdrawn / abandoned |
| Hydro Hydro |
1.3 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)