United States βΊ Grid βΊ Interconnection queues βΊ Vermont
SOLAR Β· ISO-NESolar
Solar is a 12.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Essex County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 843
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- POI location: 44.777214,-71.633269 New 34.5 kV Line Tap at VEC Pole 84-872
- Location
- Essex County, Vermont
- Technology
- Solar: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 7 March 2019
- Proposed online date
- July 2020
- Withdrawn
- April 2019
Location
Marker shows the centre of Essex County; the queue data does not give exact sites.
Other requests in Essex County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem