United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in PJM (Mid-Atlantic, Midwest) (2018 requests) β€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6810.1 GW
Active in queue10.1 GW68 requests
Agreement signed4,211 MW34 requests
Withdrawn31146.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

68 requests Β· page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Sunridge Solar
Solar
50.0 MWAgreement signed Rockingham, VAPJM Dec 2018target 2026
Recreation Solar
Solar
49.5 MWPaused / redesign Guernsey, OHPJM Sep 2018target 2025
Concho Solar I
Solar
49.0 MWPaused / redesign Queen Anne's, MDPJM Mar 2018target 2024
Glen Falls Facility
Gas
45.0 MWAgreement signed Harrison, WVPJM Mar 2018target 2029
Vinton Energy Storage
Battery storage
42.0 MWPaused / redesign Vinton, OHPJM Aug 2018target 2026
Ho-Fel Solar
Solar
40.0 MWPaused / redesign Isle Of Wight, VAPJM Sep 2018target 2026
Blue Creek Wind Farm
Solar
26.0 MWPaused / redesign Van Wert, OHPJM Sep 2018target 2024
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Oct 2018target 2026
Jackson Center Solar Facility
Solar
20.0 MWAgreement signed Mercer, PAPJM Sep 2018target 2026
Winterpock I
Solar
20.0 MWAgreement signed Chesterfield, VAPJM Aug 2018target 2025
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Jan 2018target 2026
Staley Solar
Solar
20.0 MWAgreement signed Kankakee, ILPJM Feb 2018target 2024
Confer Solar I
Solar
20.0 MWPaused / redesign Centre, PAPJM Oct 2018target 2026
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Apr 2018target 2026
Warren Glen Storage
Battery storage
20.0 MWAgreement signed Warren, NJPJM Sep 2018target 2024
Welcome Solar II
Solar + storage
19.9 MWAgreement signed Crawford, PAPJM Sep 2018target 2026
Welcome Solar, LLC
Solar + storage
19.9 MWAgreement signed Mercer, PAPJM Aug 2018target 2027
Monroe-Sicklerville Road LF Solar
Solar
1.6 MWAgreement signed Gloucester, NJPJM Mar 2018target 2025
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)