United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 15
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Desert Palm BESS Battery storage · Desert Palm BESS LLC |
201 MW | In study |
| El Molino Solar SLF Solar + storage · El Molino Solar, LLC |
201 MW | In study |
| Caladium BESS Battery storage · Caladium Storage, LLC |
201 MW | In study |
| Snap Jaw BESS Other · Moccasin Pointe Grid, LLC |
201 MW | Paused / redesign |
| Finch Storage Battery storage · Finch Storage, LLC |
201 MW | In study |
| Tucana BESS Battery storage · BRP Tucana BESS LLC |
201 MW | In study |
| Rush ESS Battery storage · OCI Solar Power LLC |
201 MW | In study |
| Nockenut Springs Solar 5 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Nockenut Springs Solar 4 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Savannah Oaks Solar Solar · Savannah Oaks Solar Project LLC |
201 MW | In study |
| Wintergarden BESS Battery storage · Wintergarden BESS LLC |
201 MW | In study |
| Spinosa BESS Battery storage · Spinosa Energy Center, LLC |
201 MW | In study |
| Outer Loop BESS Battery storage · Black Mountain Energy Storage II |
201 MW | In study |
| Seragio BESS Battery storage · Seragio BESS, LLC |
201 MW | In study |
| BRP Pictor BESS Battery storage · BRP Pictor BESS LLC |
201 MW | In study |
| Morrow Lake Storage Solar + storage · Morrow Lake Storage, LLC |
201 MW | In study |
| Pine Forest BESS 2 Battery storage |
201 MW | Paused / redesign |
| Motif BESS II Battery storage · Motif Storage, LLC |
201 MW | In study |
| Jasper BESS Battery storage · Jasper BESS, LLC |
201 MW | In study |
| Blue Heron BESS Battery storage · Blue Heron BESS, LLC |
201 MW | In study |
| Big Rooter West Storage Solar + storage · Big Rooter West, LLC |
201 MW | In study |
| Goat Mountain BESS Wind + storage · Goat Wind LLC |
201 MW | In study |
| Moonlight Sonata BESS Battery storage · Samsung Solar Energy 2, LLC |
201 MW | In study |
| Tarim BESS Battery storage · BRP Tarim BESS LLC |
201 MW | In study |
| Hamlet Solar SLF Solar + storage · Hamlet Solar, LLC |
201 MW | In study |
| Clapton Solar Solar + storage · Clapton Solar |
201 MW | In study |
| Marcus Energy Storage Battery storage · Marcus Energy Storage, LLC |
201 MW | In study |
| Zelus BESS Battery storage · BRP Zelus BESS LLC |
201 MW | In study |
| Elbus BESS Battery storage · BRP Elbus BESS LLC |
201 MW | In study |
| De Los Santos Battery storage · BRP De Los Santos BESS LLC |
201 MW | In study |
| Copano Bay Energy Storage Battery storage · Copano Bay Energy Storage, LLC |
201 MW | In study |
| Stella 2 Wind Onshore wind · Eon |
201 MW | Paused / redesign |
| Smokey Willie Solar SLF Solar + storage · Neches Solar, LLC |
201 MW | In study |
| Timberline Solar Solar + storage · Timberline Renewables, LLC |
201 MW | In study |
| Hamlet Storage SLF Solar + storage · Hamlet Solar, LLC |
201 MW | In study |
| Dahlia Solar Solar · Dahlia Energy LLC |
201 MW | In study |
| Oakley BESS Battery storage · Oakley BESS LLC |
201 MW | In study |
| Castle Corral BESS Battery storage |
201 MW | Paused / redesign |
| Cottontail Energy Center Battery storage · Cottontail Energy Center, LLC |
201 MW | In study |
| Possum Kingdom BESS Solar + storage · PK Solar, LLC |
201 MW | In study |
| Sloan Storage Battery storage · Sloan Energy Storage LLC |
201 MW | In study |
| Kahla Storage Battery storage · BT Kahla Storage, LLC |
201 MW | In study |
| Cebocell BESS Battery storage · Cebocell, LLC |
201 MW | In study |
| Sengun BESS Battery storage · BRP Blue Topaz 12, LLC |
201 MW | In study |
| Cummins BESS Battery storage · RWE Solar Development, LLC |
201 MW | In study |
| Fike BESS Battery storage · BRP Blue Topaz 9, LLC |
201 MW | In study |
| Falcon Zapata Storage 138 Battery storage · Falcon BESS, LLC |
201 MW | In study |
| Augie BESS Battery storage · BRP Blue Topaz 5, LLC |
201 MW | In study |
| Rio Hondo BESS Battery storage · SBESS TX25 LLC |
201 MW | In study |
| Bobcat Cameron BESS Battery storage · Bobcat BESS, LLC |
201 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)