Pen Bryn Oer Wind Farm
Pen Bryn Oer Wind Farm is a 6 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 6 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- NP22 5QR
- Coordinates
- 51.7749, -3.2759
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Pen Bryn Oer Wind Farm compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,060 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by RES GroupNearby generating sites
- Hafod CIC Β· 2.78 MW solar farm9.8 km
- Penyrheollas Β· 4.99 MW solar farm10.3 km
- Hendai Β· 13.4 MW solar farm11.4 km
- Darran Β· 1.82 MW solar farm11.8 km
- Pen Rhiw Β· 4.75 MW solar farm13.5 km
- Crumlin Β· 4.55 MW solar farm14.3 km
- Mynydd Bwllfa Β· 22.5 MW onshore wind farm16.5 km
- Singrug Β· 12 MW solar farm17.2 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- REG Windpower/ BlackRock
- Planning authority
- Caerphilly
- Planning reference
- 13/0483/FULL
- Application submitted
- 28 June 2013
- Permission granted
- 6 August 2015
- Construction started
- 15 January 2017
- Began operating
- 15 January 2018
- Capacity in planning record
- 4 MW
- Address
- Pen Bryn Oer, Merthyr Road, Rhymney, Mid Glamorgan
- REPD reference
- 4412
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.