Carland Cross RP

Carland Cross RP is a 20 MW onshore wind farm in South West England, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • South West
  • England
Project stageOperating
  1. PlanningNov 2008 (completed)
  2. ConsentedJan 2010 (completed)
  3. ConstructionJan 2013 (completed)
  4. OperatingOct 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
20 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TR8 5JB
Coordinates
50.3509, -5.0306

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Carland Cross RP compares

226th of 488largest wind farms in the UK register
1st of 19in South West
0.07%of listed UK wind farms capacity
β‰ˆ 46 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20 MW station would generate roughly 46 GWh of electricity in a year, similar to the annual use of about 16,870 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in South West All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Carland Cross Wind Farm Repowering
Developer / operator
Scottish Power Renewables
Planning authority
Cornwall
Planning reference
EA28/2038/08/B
Application submitted
24 November 2008
Permission granted
20 January 2010
Construction started
23 January 2013
Began operating
30 October 2013
Capacity in planning record
20 MW
Address
Carland Cross, Mitchell, Truro, Cornwall
REPD reference
3976

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.