Trefullock
Trefullock is a 5 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TR8 5BH
- Coordinates
- 50.3666, -4.9565
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Trefullock compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Greencoat CapitalNearby generating sites
- Burthy Β· 13.1 MW solar farm1.3 km
- Indian Queens Power Ltd Β· 140 MW oil-fired power station3.0 km
- Hewas Β· 5.98 MW solar farm3.4 km
- Carnemough Β· 10.1 MW solar farm4.3 km
- Carland Cross RP Β· 20 MW onshore wind farm5.5 km
- Tregassow Β· 5.87 MW solar farm7.8 km
- Garlenick Β· 4 MW onshore wind farm8.3 km
- Trevemper Β· 1.7 MW solar farm8.6 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Trefullock Solar Farm
- Developer / operator
- Bosch Solar Energy
- Planning authority
- Cornwall
- Planning reference
- PA10/06679
- Application submitted
- 20 October 2010
- Permission granted
- 7 January 2011
- Construction started
- 1 July 2011
- Began operating
- 7 July 2011
- Capacity in planning record
- 5 MW
- Address
- Land At Trefullock, Trefullock Moor, Summercourt, Cornwall
- REPD reference
- 1080
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.