Garlenick

Garlenick is a 4 MW onshore wind farm in South West England, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • South West
  • England
Project stageOperating
  1. PlanningNov 2012 (completed)
  2. ConsentedJan 2013 (completed)
  3. ConstructionApr 2014 (completed)
  4. OperatingJun 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Capital Dynamics UK
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TR2 4RQ
Coordinates
50.3069, -4.8851

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Garlenick compares

433rd of 488largest wind farms in the UK register
13th of 19in South West
0.01%of listed UK wind farms capacity
β‰ˆ 9.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 4 MW station would generate roughly 9.1 GWh of electricity in a year, similar to the annual use of about 3,370 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in South West All run by Capital Dynamics UK

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Garlenick Estate 2 - Wind Turbines
Developer / operator
Airvolution Energy
Planning authority
Cornwall
Planning reference
PA12/09852
Application submitted
1 November 2012
Permission granted
31 January 2013
Construction started
1 April 2014
Began operating
18 June 2015
Capacity in planning record
4 MW
Address
Garlenick Estate Grampound Cornwall, Cornwall
REPD reference
3917

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.