Tregassow
Tregassow is a 5.87 MW solar farm in South West England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 5.87 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TR4 9BL
- Coordinates
- 50.3069, -5.0152
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Tregassow compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.87 MW station would generate roughly 5.1 GWh of electricity in a year, similar to the annual use of about 1,900 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Octopus InvestmentsNearby generating sites
- Penare Β· 11.1 MW solar farm4.3 km
- Carland Cross RP Β· 20 MW onshore wind farm5.0 km
- Carnemough Β· 10.1 MW solar farm6.7 km
- Hewas Β· 5.98 MW solar farm7.1 km
- Trefullock Β· 5 MW solar farm7.8 km
- Causilgey Β· 5 MW solar farm7.8 km
- Garvinack Β· 9.62 MW solar farm7.8 km
- Burthy Β· 13.1 MW solar farm8.2 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Tregassow Farm - Solar Modules
- Developer / operator
- Private Developer
- Planning authority
- Cornwall
- Planning reference
- PA12/04244
- Application submitted
- 24 May 2012
- Permission granted
- 16 November 2012
- Construction started
- 13 January 2013
- Began operating
- 28 March 2013
- Capacity in planning record
- 6 MW
- Address
- Tregassow Farm, St Erme, Truro, Cornwall, Cornwall, TR4 9BL
- REPD reference
- 1353
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.