Turweston
Turweston is a 16.4 MW solar farm in South East England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 16.4 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- NN13 5YD
- Coordinates
- 52.0386, -1.1039
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Turweston compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 16.4 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,330 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Greencoat CapitalNearby generating sites
- Radstone Β· 5.22 MW solar farm3.3 km
- Shelswell Β· 5.06 MW solar farm7.2 km
- Culworth Β· 3.64 MW solar farm10.5 km
- Homestead Β· 17.7 MW solar farm13.9 km
- Mount Mill Β· 12 MW solar farm14.8 km
- Blisworth Solar Farm Β· 3.59 MW solar farm18.5 km
- Bicester Β· 18.4 MW solar farm19.5 km
- New Stone House Β· 11.5 MW solar farm19.7 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Turweston Solar Farm
- Developer / operator
- INRG Solar
- Planning authority
- Buckinghamshire
- Planning reference
- 13/01561/APP
- Application submitted
- 14 June 2013
- Permission granted
- 10 September 2013
- Construction started
- 15 November 2013
- Began operating
- 19 December 2014
- Capacity in planning record
- 16.7 MW
- Address
- Turweston Aerodrome, Whitfield Road, Biddlesden, Buckinghamshire, Buckinghamshire, NN13 5YD
- REPD reference
- 2081
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.