SOLAR Β· OPERATIONAL

Radstone

Radstone is a 5.22 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningSep 2013 (completed)
  2. ConsentedDec 2013 (completed)
  3. ConstructionDec 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.22 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NN13 5PY
Coordinates
52.0545, -1.1454

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Radstone compares

247th of 662largest solar farms in the UK register
35th of 95in East Midlands
0.09%of listed UK solar farms capacity
β‰ˆ 4.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.22 MW station would generate roughly 4.6 GWh of electricity in a year, similar to the annual use of about 1,690 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hall Farm
Developer / operator
United Photovoltaics
Planning authority
West Northamptonshire
Planning reference
S/2013/1228/MAF
Application submitted
23 September 2013
Permission granted
3 December 2013
Construction started
1 December 2014
Began operating
30 March 2015
Capacity in planning record
5.1 MW
Address
Hall Farm, Radstone, Brackley, Northamptonshire
REPD reference
2362

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026