Swanland

Swanland is a 5 MW solar farm in East of England, England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningMay 2015 (completed)
  2. ConsentedJan 2016 (completed)
  3. ConstructionJan 2017 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EN6 3NH
Coordinates
51.6903, -0.2247

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Swanland compares

252nd of 662largest solar farms in the UK register
41st of 76in East of England
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land At Swanland Road
Developer / operator
Gascoyne Holdings
Planning authority
Hertsmere
Planning reference
15/0784/FUL
Application submitted
28 May 2015
Permission granted
7 January 2016
Construction started
3 January 2017
Began operating
23 March 2017
Capacity in planning record
5 MW
Address
Land At, Swanland Road, South Mimms, Potters Bar, Hertfordshire, EN6 3NE
REPD reference
5295

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.